Red Hat OpenShift AI Migration from 2.25 → 3.5 a Field Manual

An in-place migration from Red Hat OpenShift AI 2.25.10+ to 3.5, ordered by when you do the work. Every command has a verify step, and every known break is documented where you hit it.

The order that matters

Migrate workloads off a component before you remove it

  1. Pre-flight, baseline, assess

    Confirm prerequisites, take a verified backup, record what works today, and run the rhai-cli assessment.

  2. Convert, remediate, stop workbenches

    Move models to RawDeployment, back up stateful components, disable removed components, triage workbench images.

  3. Switch channel and approve

    support-required-upgrade-3.5, then JobSet, then stable-3.5. From here the only rollback is the backup.

  4. Verify, re-test, clean up

    Clear the gates, get the Gateway programmed, migrate workbenches and Ray, and diff against the baseline.

Start here

What lives here

RHOAI 2.25 → 3.5 migration

Pre-flight, baseline, assess, convert model serving, remediate the platform, workbench images, upgrade, post-upgrade, re-test, clean up.

RHOAI 2.25 → 3.5 migration

Things that broke

A symptom index: match what you see, then jump to the fix on the page where it happens.

Things that broke

For readers

Questions people actually ask

Does running rhai-cli lint stop me from upgrading too early?

No. The lint is advisory. The 3.5 operator holds the DSC at upgrade gates, but by then rollback is no longer supported. Clear the lint first.

Will my model endpoints change?

Only for models you convert from Serverless or ModelMesh. An ISVC that was already RawDeployment keeps its Route and URL. Dashboard and workbench URLs do change.

Why does every command show its expected output?

A command whose output nobody checks is a guess about the system’s state. Comparing against the expected output turns “ran it” into “confirmed it”.