RHOAI 2.25 → 3.5 migration
Pre-flight, baseline, assess, convert model serving, remediate the platform, workbench images, upgrade, post-upgrade, re-test, clean up.
field manual
An in-place migration from Red Hat OpenShift AI 2.25.10+ to 3.5, ordered by when you do the work. Every command has a verify step, and every known break is documented where you hit it.
The order that matters
Confirm prerequisites, take a verified backup, record what works today, and run the rhai-cli assessment.
Move models to RawDeployment, back up stateful components, disable removed components, triage workbench images.
support-required-upgrade-3.5, then JobSet, then stable-3.5. From here the only rollback is the backup.
Clear the gates, get the Gateway programmed, migrate workbenches and Ray, and diff against the baseline.
Start here
Pre-flight, baseline, assess, convert model serving, remediate the platform, workbench images, upgrade, post-upgrade, re-test, clean up.
A symptom index: match what you see, then jump to the fix on the page where it happens.
For readers
No. The lint is advisory. The 3.5 operator holds the DSC at upgrade gates, but by then rollback is no longer supported. Clear the lint first.
Only for models you convert from Serverless or ModelMesh. An ISVC that was already RawDeployment keeps its Route and URL. Dashboard and workbench URLs do change.
A command whose output nobody checks is a guess about the system’s state. Comparing against the expected output turns “ran it” into “confirmed it”.
We want your feedback.Report issues here